NSC assembled and erected a 100-cell GE air-cooled condenser (ACC) system and 13,200 tons of structural steel, ductwork, and auxiliary equipment for this 1,200 MW combined-cycle power plant near Las Vegas, NV
ACC System Installation
Installed a 100-cell ACC system and all associated auxiliary components
Set major structural modules, fan decks, and support framing
Heavy rigging of large GE condenser units and equipment
Structural Steel, Ductwork & Equipment
Erected 13,200+ tons of structural steel, ductwork, and mechanical support structures
Installed platforms, access systems, and elevated steel for the ACC fan structure
Integrated condenser equipment with plant steam systems