NSC was subcontracted to demolish and rebuild the existing precipitator system and erect the Selective Catalytic Reduction (SCR) system as part of a major environmental retrofit at Gulf Power’s Plant Crist in Pensacola, Florida

Precipitator Rebuild

  • Demolition of the existing precipitator system
  • Rebuild of a new Alstom-designed precipitator, including:
    • Structural steel framing
    • Internal collection components
    • Booster fans and mechanical internals

Boiler Structural Retrofit

  • Structural retrofit of the boiler to accommodate the new SCR system for Unit 6
  • Modifications executed within an operating plant environment

SCR System Installation

  • Complete installation of SCR components on Unit 6, including:
    • SCR ductwork from boiler outlet duct guillotine damper through the SCR structure
    • Installation of catalyst modules, mechanical components, and hoppers
    • Replacement of air heaters associated with the SCR system