Location:
Mobile, AL
Client:
Industry:
Power & Utilities
Category:
Industrial Plants
Project Type:
Project Details
• Complete internal demolition and rebuild of the Unit 5 precipitator
• Installation of all mechanical equipment at storage silos and load-out silos, including truck weigh scale systems
• Erection of all structural steel, framing, and pipe racks supporting the dry ash handling system
• Installation of associated piping and mechanical components
• Stacked precipitator configuration required demolition and installation through the bottom of the hoppers, resulting in complex access and rigging conditions