Location:

Las Vegas, NV

Client:

Industry:

Power & Utilities

Category:

Industrial Plants

Project Type:

Structural Steel Erection
ACC
Ductwork
Equipment Rigging

National Steel City supported the expansion and modernization of Tracy Station, a major natural gas–fired power plant operated by NV Energy in Reno, Nevada

Project Details

  • Assembly and erection of a 30-cell air-cooled condenser (ACC) system
  • Structural steel erection supporting the ACC fan decks and auxiliary systems
  • Installation of large diameter ductwork and transition sections
  • Heavy equipment setting and mechanical tie-in support
  • Coordination of erection activities within an active power generation facility
  • Accelerated schedule executed ahead of schedule
  • Dry-cooling technology reducing water usage by ~77%