Location:

Kingston, TN

Client:

Industry:

Power & Utilities

Category:

Industrial Plants

Project Type:

Structural Steel Erection
Ductwork
Equipment Rigging

NSC installed an Advatech-designed absorber vessel and erected all structural and miscellaneous steel, ductwork, and associated systems for this dry flue gas desulfurization (FGD) project in Kingston, TN.

Absorber Vessel & Environmental Control Systems

  • Installed an Advatech-designed absorber vessel as part of the new dry FGD system
  • Completed all mechanical connections and structural supports for the absorber system

Structural Steel, Ductwork & Equipment Installation

  • Erected major structural and miscellaneous steel supporting the new FGD equipment
  • Unloaded barges containing prefabricated components
  • Installed and erected large-diameter ductwork and tie-ins

Retrofit & Plant Integration

  • Performed structural retrofit work to modify existing structures for new equipment loads
  • Integrated new environmental control equipment into the operating plant infrastructure

Explore Related Projects

all Projects

Ready to work with NSC?
Contact us today.